Line 11 Info
- Network Beijing Subway
- Operation Started 2002
- Total Length 2.9 km
- Total Stations 4
Terminals
From
Moshikou
To
Xinshougang (Shougang Park)
Line 11 Overview
The first phase of Beijing Metro Line 11, the Moshikou-Xinshuogang section, opened for public service on December 31, 2021. This is a short western section, 4 kilometers long and consisting of four stations. The line connects with Line 6 and Line S1 at Jin'anqiao. The second phase is planned to extend the line eastward through central Beijing with several additional stations.
Beijing Subway Map 2026
Click to expand
Other Lines in Beijing Subway
Capital Airport Line
Beixinqiao ↔ 2 Hao Hangzhanlou (Terminal 2)
Changping Line
Changping Xishankou ↔ Jimenqiao
Daxing Airport Line
Lize Shangwuqu ↔ Daxing Jichang (Daxing Airport)
Fangshan Line
Dongguantounan ↔ Yancundong
Line 1 (Batong)
Fushouling ↔ Universal Resort
Line 10
Bagou ↔ Huoqiying
Line 13
Xizhimen ↔ Dongzhimen
Line 14
Zhangguozhuang ↔ Taoranqiao
Line 15
Line 16
Line 17
Line 19
Caoqiao ↔ Xingong
Frequently Asked Questions — Line 11
Line 11 has 4 stations on the Beijing Subway network.
Line 11 runs between Moshikou and Xinshougang (Shougang Park).
Line 11 is approximately 2.9 km long.
Line 11 opened in 2002.
Line 11 is a Metro line operated under Beijing Subway.
Line 11 is part of the Beijing Subway transit network.