Line 10 Info
- Network Beijing Subway
- Operation Started 2008
- Total Length 57.1 km
- Total Stations 45
Terminals
From
Bagou
To
Huoqiying
Line 10 Overview
Beijing Subway Line 10 opened on July 19, 2008, as a loop line around central Beijing. The line was completed as a full loop on May 5, 2013. It is 57.1 kilometers long, has 45 stations, and runs entirely underground. Line 10 is Beijing's second ring line, located between the Second and Third Ring Roads and connecting to almost all radial lines through 24 interchange stations.
Beijing Subway Map 2026
Click to expand
Other Lines in Beijing Subway
Capital Airport Line
Beixinqiao ↔ 2 Hao Hangzhanlou (Terminal 2)
Changping Line
Changping Xishankou ↔ Jimenqiao
Daxing Airport Line
Lize Shangwuqu ↔ Daxing Jichang (Daxing Airport)
Fangshan Line
Line 1 (Batong)
Fushouling ↔ Universal Resort
Line 11
Moshikou ↔ Xinshougang (Shougang Park)
Line 13
Xizhimen ↔ Dongzhimen
Line 14
Zhangguozhuang ↔ Shangezhuang
Line 15
Qinghua Donglu Xikou ↔ Shunyi
Line 16
Line 17
Line 19
Frequently Asked Questions — Line 10
Line 10 has 45 stations on the Beijing Subway network.
Line 10 runs between Bagou and Huoqiying.
Line 10 is approximately 57.1 km long.
Line 10 opened in 2008.
Line 10 is a Metro line operated under Beijing Subway.
Line 10 is part of the Beijing Subway transit network.