Line 1 (Batong) Info
- Network Beijing Subway
- Operation Started 1971
- Total Length 50.9 km
- Total Stations 37
Terminals
From
Fushouling
To
Universal Resort
Line 1 (Batong) Overview
The first phase of Beijing Metro Line 1 opened on January 15, 1971, between Pingguoyuan and Beijing Railway Station. The line was extended eastward to Sihui in stages and later connected to the Batong Line. It is approximately 31.0 km long, with 23 stations. This line is one of the oldest and busiest routes in the Beijing Metro system.
Beijing Subway Map 2026
Click to expand
Other Lines in Beijing Subway
Capital Airport Line
Beixinqiao ↔ 2 Hao Hangzhanlou (Terminal 2)
Changping Line
Changping Xishankou ↔ Jimenqiao
Daxing Airport Line
Lize Shangwuqu ↔ Daxing Jichang (Daxing Airport)
Fangshan Line
Line 10
Sanyuanqiao ↔ Huoqiying
Line 11
Moshikou ↔ Xinshougang (Shougang Park)
Line 13
Xizhimen ↔ Dongzhimen
Line 14
Zhangguozhuang ↔ Shangezhuang
Line 15
Qinghua Donglu Xikou ↔ Cuigezhuang
Line 16
Line 17
Line 19
Frequently Asked Questions — Line 1 (Batong)
Line 1 (Batong) has 37 stations on the Beijing Subway network.
Line 1 (Batong) runs between Fushouling and Universal Resort.
Line 1 (Batong) is approximately 50.9 km long.
Line 1 (Batong) opened in 1971.
Line 1 (Batong) is a Metro line operated under Beijing Subway.
Line 1 (Batong) is part of the Beijing Subway transit network.