Line 15 Info
- Network Beijing Subway
- Operation Started 2010
- Total Length 41.4 km
- Total Stations 20
Terminals
From
Qinghua Donglu Xikou
To
Fengbo
Line 15 Overview
The first phase of Beijing Metro Line 15 opened on December 30, 2010, between Wangjing West and Houxiu. The line was extended eastward to Fengbo in phases, and the first corridor entered full operation on December 30, 2011. The line is 41.4 km long, with 20 stations, and includes key interchange stations such as Wangjingxi and Olympic Green.
Beijing Subway Map 2026
Click to expand
Other Lines in Beijing Subway
Capital Airport Line
Beixinqiao ↔ 2 Hao Hangzhanlou (Terminal 2)
Changping Line
Changping Xishankou ↔ Jimenqiao
Daxing Airport Line
Lize Shangwuqu ↔ Daxing Jichang (Daxing Airport)
Fangshan Line
Dongguantounan ↔ Yancundong
Line 1 (Batong)
Fushouling ↔ Universal Resort
Line 10
Bagou ↔ Huoqiying
Line 11
Moshikou ↔ Xinshougang (Shougang Park)
Line 13
Xizhimen ↔ Dongzhimen
Line 14
Zhangguozhuang ↔ Caihuying
Line 16
Line 17
Line 19
Frequently Asked Questions — Line 15
Line 15 has 20 stations on the Beijing Subway network.
Line 15 runs between Qinghua Donglu Xikou and Fengbo.
Line 15 is approximately 41.4 km long.
Line 15 opened in 2010.
Line 15 is a Metro line operated under Beijing Subway.
Line 15 is part of the Beijing Subway transit network.