Line 14 Info
- Network Beijing Subway
- Operation Started 2013
- Total Length 47.3 km
- Total Stations 36
Terminals
From
Zhangguozhuang
To
Shangezhuang
Line 14 Overview
The first phase of Beijing Metro Line 14 opened on May 5, 2013, between Zhangguozhuang and Shizhu. The line was expanded in several phases, with the eastern section opening between 2014 and 2017, and the central section completed on December 31, 2021. The line is 47.3 km long and has 36 stations. It runs on an L-shaped route across southern and eastern Beijing and includes major interchanges such as Beijing South Railway Station, Shilihe, and Wangjing.
Beijing Subway Map 2026
Click to expand
Other Lines in Beijing Subway
Capital Airport Line
Beixinqiao ↔ 2 Hao Hangzhanlou (Terminal 2)
Changping Line
Changping Xishankou ↔ Jimenqiao
Daxing Airport Line
Lize Shangwuqu ↔ Daxing Jichang (Daxing Airport)
Fangshan Line
Line 1 (Batong)
Fushouling ↔ Universal Resort
Line 10
Bagou ↔ Huoqiying
Line 11
Moshikou ↔ Xinshougang (Shougang Park)
Line 13
Xizhimen ↔ Dongzhimen
Line 15
Qinghua Donglu Xikou ↔ Wangjingdong
Line 16
Line 17
Line 19
Frequently Asked Questions — Line 14
Line 14 has 36 stations on the Beijing Subway network.
Line 14 runs between Zhangguozhuang and Shangezhuang.
Line 14 is approximately 47.3 km long.
Line 14 opened in 2013.
Line 14 is a Metro line operated under Beijing Subway.
Line 14 is part of the Beijing Subway transit network.