Line 5 Info
- Network Beijing Subway
- Operation Started 2007
- Total Length 27.6 km
- Total Stations 23
Terminals
From
Tiantongyuanbei
To
Songjiazhuang
Line 5 Overview
Beijing Subway Line 5 opened for public service on October 7, 2007. This line runs north-south from Tiangongyuan North to Songjiazhuang, covering 27.6 km and having 23 stations. It passes through central Beijing and includes major interchange stations such as Dongdan, Yonghegong Lama Temple, and Ciqikou.
Beijing Subway Map 2026
Click to expand
Other Lines in Beijing Subway
Capital Airport Line
Beixinqiao ↔ 2 Hao Hangzhanlou (Terminal 2)
Changping Line
Changping Xishankou ↔ Jimenqiao
Daxing Airport Line
Lize Shangwuqu ↔ Daxing Jichang (Daxing Airport)
Fangshan Line
Huaxiang Dongqiao ↔ Yancundong
Line 1 (Batong)
Fushouling ↔ Universal Resort
Line 10
Bagou ↔ Huoqiying
Line 11
Moshikou ↔ Xinshougang (Shougang Park)
Line 13
Xizhimen ↔ Dongzhimen
Line 14
Zhangguozhuang ↔ Wangjing
Line 15
Line 16
Line 17
Frequently Asked Questions — Line 5
Line 5 has 23 stations on the Beijing Subway network.
Line 5 runs between Tiantongyuanbei and Songjiazhuang.
Line 5 is approximately 27.6 km long.
Line 5 opened in 2007.
Line 5 is a Metro line operated under Beijing Subway.
Line 5 is part of the Beijing Subway transit network.