Madrid Metro logo

Line 7

Madrid Metro
Metro 32.9 km

Line 7 Stations (0)

Hospital del Henares
Henares
Jarama
San Fernando
La Rambla
Coslada Central
Barrio del Puerto
Estadio Metropolitano
Las Musas
San Blas
Simancas
García Noblejas
Ascao
Pueblo Nuevo
Barrio de la Concepción
Parque de las Avenidas
Cartagena
Avenida de América
Gregorio Marañón
Alonso Cano
Canal
Islas Filipinas
Guzmán el Bueno
Francos Rodríguez
Valdezarza
Antonio Machado
Peñagrande
Avenida de la Ilustración
Lacoma
Arroyofresno
Pitis

Line 7 Info

  • Network Madrid Metro
  • Operation Started 1974
  • Total Length 32.9 km
  • Total Stations 31

Terminals

From Hospital del Henares
To Pitis

Line 7 Overview

Line 7 was inaugurated on July 17, 1974, and constructed in several phases. The line originally ran between Pueblo Nuevo and Las Musas, and was extended in 2007 via the Metroeste branch to Pitín in the west and Hospital del Henares in the east. The line is 32.9 kilometers long and has 31 stations. It also provides interchange facilities for several metro lines and Cercanías Madrid services at Pitín station, improving connectivity between the eastern suburbs and central Madrid.

Madrid Metro Map 2026

Madrid Metro map
Click to expand

Frequently Asked Questions — Line 7

Line 7 has 31 stations on the Madrid Metro network.

Line 7 runs between Hospital del Henares and Pitis.

Line 7 is approximately 32.9 km long.

Line 7 opened in 1974.

Line 7 is a Metro line operated under Madrid Metro.

Line 7 is part of the Madrid Metro transit network.